Tank in Tank

— elevating functional aesthetics through engineering innovation 

Tank-in-Tank-Lighted-Ball-Concept

— length & type

4 months
Industrial Design

— role

Industrial Designer

— team

2 Industrial Designers, 1 Lead Industrial Designer, 2 Mechanical Engineers

TT3Detail
TT2Detail

— Given the nature of this project, further insights and design process can only be revealed in an interview setting.

2016 for Kohler Co.
 
 

© 2023 Esmerly Simé Segura. This website is currently under construction with new content coming in every week. Feel free to come back or reach out to learn more.

Back to top Arrow
View